PPI wins bidding package for upgrading provincial road 835B
30/12/2011 09:12 am

News - Pacific Infrastructure Development and Real Estate Joint Stock Co (coded PPI) has won the bidding package No 1 for upgrading the provincial road No 835B, following the decision issued by Long An province's department of transportation dated December 20, 2011.
The project is situated in two districts of Ben Luc and Can Giuoc, Long An province. The bidding package has total value of 46 billion dong, to be conducted within 12-month period. The company planned to start construction works on this project on January 4, 2012.
The project is situated in two districts of Ben Luc and Can Giuoc, Long An province. The bidding package has total value of 46 billion dong, to be conducted within 12-month period. The company planned to start construction works on this project on January 4, 2012.
Source: PPI
.:: Other news
• Construction of Dan-Nui Coc Lake Road starts (22/05/2012)
• 1.4b USD support package sought for producers (17/05/2012)
• PTSC subsidiary wins contract for drilling rigs (17/05/2012)
• Bailout package under consideration (07/05/2012)
• Challenging road for some PPP projects (24/04/2012)
• Hanoi starts building Nhat Tan - Cau Giay road (23/03/2012)
• Plan to build road from Mai Dich to South Thang Long (06/03/2012)
• Long An to invest in road systems (02/03/2012)
• Airport road to see property take off (28/02/2012)
• HCM Road runs through 28 localities (21/02/2012)
• 1.4b USD support package sought for producers (17/05/2012)
• PTSC subsidiary wins contract for drilling rigs (17/05/2012)
• Bailout package under consideration (07/05/2012)
• Challenging road for some PPP projects (24/04/2012)
• Hanoi starts building Nhat Tan - Cau Giay road (23/03/2012)
• Plan to build road from Mai Dich to South Thang Long (06/03/2012)
• Long An to invest in road systems (02/03/2012)
• Airport road to see property take off (28/02/2012)
• HCM Road runs through 28 localities (21/02/2012)
